Really happy with their products
They look modern and feel good quality. The price was competitive and delivery was prompt. Very pleased and will buy again.
Every guide says the pipe centres “should be the same”. None of them says how far out you can be. Here is the ladder we work to as heating engineers, in millimetres, from “the valves will take it up” to “the pipes have to move”.
| Difference between your pipes and the radiator | What absorbs it | What to buy | Looks |
|---|---|---|---|
| Up to 10mm either way | Play in the valve bodies and tails | Nothing extra | Invisible |
| Radiator narrower by 10–30mm | One rigid tail extension each side (15mm) | Pair of 15mm rigid extensions | A few mm of chrome, hidden behind the valve |
| Radiator narrower by 30–60mm | Rigid extensions, 20–30mm each side | Pair of 20mm or 30mm extensions | Neat if split evenly |
| Radiator narrower by 60–100mm | Rigid extensions, 40–50mm each side | Pair of 40mm or 50mm extensions | Visible but tidy; keep the radiator centred |
| Radiator narrower by more than 100mm | Pipework: offsets, elbows or a new tail | 15mm offsets or two street elbows a side | A soldered dog-leg; best hidden or boxed |
| Radiator wider than the pipes by more than 10mm | Nothing — no adaptor makes pipes further apart | Pipework alteration | Depends on the floor |
Telescopic (adjustable) tails are tempting because one part covers 20–70mm. They seal on an O-ring that sits in the flow all day, and the trade’s experience is that they weep sooner or later. Rigid extension pieces in fixed lengths — 15, 20, 30, 40 and 50mm — screw into the radiator tapping with a proper thread seal and never move. If the gap is awkward, combine two sizes rather than cutting. Split the total across both sides so the radiator sits centred on the pipes.
Width is only half of the fit. The distance from the wall to the pipe centre must match too, and it changes with the type of radiator: a single panel sits about 35–50mm off the wall, a double or a 2–3 column 57–68mm, a 4 column 95mm, a 6 column 133mm, a towel rail 55–85mm. Within 10mm the valves cope. From 10 to 30mm you pack the brackets out (timber or the alternative hanging slots most brackets have) or use offset tails. Beyond 30mm the pipes need to come forward or go back, which is a pipework job.
On a suspended timber floor it is a half-day job: lift a board, re-route the tails, drop them up through new holes. On a concrete or tiled floor the usual answer is to cut the pipes 100mm or so above the floor and run new tails behind the radiator to the right centres — tidy enough when boxed or painted, and far cheaper than breaking out the floor. Across Lancashire we do both as part of a supply-and-fit. Elsewhere, print our plumber brief: it tells a local heating engineer the exact centres, depth and parts, so the quote is right first time.
8mm and 10mm microbore changes the valve, not the radiator: you need valves (or adaptors) with the small pipe size on one side and the ½in radiator thread on the other. Plastic microbore also bends a little, which buys a few millimetres of forgiveness on the centres. Mind the output though: an 8mm pipe will struggle to feed much beyond 1.5kW and a 10mm pipe beyond about 2.5kW, so a big column radiator on microbore may never get hot enough.
The finder applies this ladder automatically: type your pipe centres and it shows exact fits, near fits with the extension length you need, and the radiators that would need the pipework moved.